RapidRide G Line – Madison St - Transportation (2024)

Legend: Check mark is completed work. Traffic cone is work in progress.

Downtown

First Hill

Capitol Hill

Madison Valley

Rebuild the street

Removed trees, excavated roads, applied temporary street markings, repaved many sections of the street

Completed permanent street markings in areas where paving is completed, including red bus lanes, green bike lanes, and crosswalks. Completed all permanent street markings on Spring St.

Upgraded existing drainage system, including new inlets and catch basins under the street

Pave few remaining sections of Madison St

Complete remaining street markings on Madison St and install final signage

Removed trees, excavated roads, applied temporary street markings, repaved many sections of the street

Started to apply final street markings in areas where paving is complete

Upgraded existing drainage system, including new inlets and catch basins under the street

Complete remaining paving

Complete final street markings once paving is completed and install final signage

Removed trees, excavated roads, installed temporary street markings, repaved many sections of the street

Started to apply final street markings in areas where paving is complete

Upgraded existing drainage system, including new inlets and catch basins under the street

Complete remaining paving

Complete final street markings once paving is completed and install final signage

Removed trees, excavated roads, applied temporary pavement markings, repaved sections of the street

Upgraded existing drainage system, including new inlets and catch basins under the street

Complete remaining paving

Apply final street markings once paving is completed and install final signage

Replace sidewalks, build curb bulbs, and new or upgraded curb ramps

Demolished existing sidewalks and relocated and installed underground utilities

Built accessible curb ramps and replaced most of the sidewalks

Complete remaining curb ramps and sidewalk repairs at some corners

Demolished existing sidewalks and relocated and installed underground utilities

Built accessible curb ramps and replaced many sections of the sidewalk

Built new curb bulbs on Spring St at the intersections of 7th Ave and 8th Ave, and at Madison St and Minor Ave

Complete remaining curb ramps and replacing sections of the sidewalk

Demolished existing sidewalks and relocated and installed underground utilities

Built accessible curb ramps, rebuilt many sections of the sidewalk

Built new curb bulbs at the intersections of Madison St and 10th Ave, Union St and Denny Way

Complete remaining curb ramps and replacing sections of the sidewalk

Build remaining new curb bulbs at the intersections of Madison St , Pike St, 12th Ave, 15th Ave, 18th Ave, and 19th Ave

Install public art where Madison St, 14th Ave, and Pike St converge

Demolished existing sidewalks and relocated and installed underground utilities

Built accessible curb ramps and replaced many sections of the sidewalk

Built new raised crosswalk at 24th Ave E and new curb bulb at Madison St and John St

Complete remaining curb ramps and replacing sections of the sidewalk

Build remaining new curb bulb at Madison St and 27th Ave

Install new and upgraded traffic signals

Removed existing signals and installed temporary signals

Installed and relocated conduit for new streetlights and signals

Installed new signal poles other elements for upgraded signals, including cabinets, lights, pedestrian push buttons, transit priority lights, improved communication systems and vehicle detection

Turned on upgraded signals at 7th Ave and Madison St and 7th Ave and Spring St

Finish installing remaining signal poles other remaining other elements for upgraded signals, and turn on remaining upgraded signals

Remove remaining temporary signals

Removed existing signals and installed temporary signals

Installed and relocated conduit for new streetlights and signals

Installed new signal poles other elements for upgraded signals, including cabinets, lights, pedestrian push buttons, transit priority lights, improved communication systems and vehicle detection

Turned on upgraded signals at 8th Ave and Madison St

Turned on new pedestrian signal at Terry Ave and Madison St.

Finish installing remaining signal poles other remaining other elements for upgraded signals, and turn on remaining upgraded signals

Turn on new signal at 9th Ave and Spring St.

Remove remaining temporary signals

Removed existing signals and installed temporary signals

Installed and relocated conduit for new streetlights and signals

Installed new signal poles other elements for upgraded signals, including cabinets, lights, pedestrian push buttons, transit priority lights, improved communication systems and vehicle detection

Turned on upgraded signals at E Denny Way/22nd Ave and E Madison

Finish installing remaining signal poles, streetlights, other remaining other elements for upgraded signals, and turn on remaining upgraded signals

Turn on new traffic signals at: 10th Ave and Madison St; 18th Ave and Madison St; 19th Ave and Union St

Remove remaining temporary signals

Remove existing signals and installed temporary signals and streetlights

Installed and relocated conduit for new streetlights and signals

Installed new signal poles other elements for upgraded signals, including cabinets, lights, pedestrian push buttons, transit priority lights, improved communication systems and vehicle detection

Finish installing remaining signal poles, streetlights, other remaining other elements for upgraded signals, and turn on upgraded signals

Turn on new traffic signal at Martin Luther King Jr Way and Harrison St

Remove remaining temporary signals

Build new bus stations and improved bus stops

Removed existing bus shelters, installed foundations for new bus stops, installed electrical conduit and relocated utilities at bus stops

Removed old trolley wires on Madison St between 5th Ave and 6th Ave and installed new trolley wire poles

Build new bus platforms, install new bus shelters and other bus stop amenities

Removed existing bus shelters, installed foundations for new bus stops, installed electrical conduit and relocated utilities at bus stops

Removed old trolley wire poles and installed new poles

Continue installing electrical conduit and relocating utilities

Build new bus platforms, install new bus shelters and other bus stop amenities

Install remaining new trolley wire poles

Complete new center-running bus stations on Madison St at 8th Ave, Terry Ave, and Boylston Ave

Removed existing bus shelters, installed foundations for new bus stops, installed electrical conduit and relocated utilities at bus stops

Removed old trolley wire poles and installed new poles

Continue installing electrical conduit and relocating utilities

Build new bus platforms, install new bus shelters and other bus stop amenities

Install remaining new trolley wire poles

Complete new center-running bus station on Madison St and 12th Ave

Removed many existing bus shelters, installed foundations for new bus stops, installed electrical conduit and relocated utilities at bus stops

Continue installing foundations, electrical conduit, and relocating utilities

Finish removing existing shelters

Build new bus platforms, install new bus shelters and other bus stop amenities

Poured foundation for new driver comfort station

Build the new bus layover area including road paving and street markings

Build remaining elements of the new comfort station including the building framing, siding, roofing, electrical, HVAC, and plumbing systems

Plant new landscaping and street trees

Installed flexi-pave around tree pits and started planting new trees and landscaping

Continue installing remaining flexi-pave, new trees, and landscaping

Install new planters on Madison St over I-5

Installed flexi-pave around tree pits and started planting new trees and landscaping

Continue installing remaining flexi-pave, new trees, and landscaping

Installed flexi-pave around tree pits and started planting new trees and landscaping

Continue installing remaining flexi-pave, new trees, and landscaping

Installed flexi-pave around tree pits and started planting new trees and landscaping

Continue installing remaining flexi-pave, new trees, and landscaping

Replace and build new underground water and sewer utilities

Built 3 new underground stormwater storage tanks (10th Ave between Madison St and Union St, Madison St between 12th Ave and 13th Ave, and E Pine St between 15th Ave and 16th Ave)

Replaced a 120-year-old water and sewer line

Upgraded fire hydrants

Replaced a 120-year-old water and sewer line

Upgraded fire hydrants

RapidRide G Line – Madison St   - Transportation (2024)

References

Top Articles
Latest Posts
Article information

Author: Pres. Carey Rath

Last Updated:

Views: 5692

Rating: 4 / 5 (41 voted)

Reviews: 80% of readers found this page helpful

Author information

Name: Pres. Carey Rath

Birthday: 1997-03-06

Address: 14955 Ledner Trail, East Rodrickfort, NE 85127-8369

Phone: +18682428114917

Job: National Technology Representative

Hobby: Sand art, Drama, Web surfing, Cycling, Brazilian jiu-jitsu, Leather crafting, Creative writing

Introduction: My name is Pres. Carey Rath, I am a faithful, funny, vast, joyous, lively, brave, glamorous person who loves writing and wants to share my knowledge and understanding with you.