Legend: Check mark is completed work. Traffic cone is work in progress.
Downtown
First Hill
Capitol Hill
Madison Valley
Rebuild the street
Removed trees, excavated roads, applied temporary street markings, repaved many sections of the street
Completed permanent street markings in areas where paving is completed, including red bus lanes, green bike lanes, and crosswalks. Completed all permanent street markings on Spring St.
Upgraded existing drainage system, including new inlets and catch basins under the street
Pave few remaining sections of Madison St
Complete remaining street markings on Madison St and install final signage
Removed trees, excavated roads, applied temporary street markings, repaved many sections of the street
Started to apply final street markings in areas where paving is complete
Upgraded existing drainage system, including new inlets and catch basins under the street
Complete remaining paving
Complete final street markings once paving is completed and install final signage
Removed trees, excavated roads, installed temporary street markings, repaved many sections of the street
Started to apply final street markings in areas where paving is complete
Upgraded existing drainage system, including new inlets and catch basins under the street
Complete remaining paving
Complete final street markings once paving is completed and install final signage
Removed trees, excavated roads, applied temporary pavement markings, repaved sections of the street
Upgraded existing drainage system, including new inlets and catch basins under the street
Complete remaining paving
Apply final street markings once paving is completed and install final signage
Replace sidewalks, build curb bulbs, and new or upgraded curb ramps
Demolished existing sidewalks and relocated and installed underground utilities
Built accessible curb ramps and replaced most of the sidewalks
Complete remaining curb ramps and sidewalk repairs at some corners
Demolished existing sidewalks and relocated and installed underground utilities
Built accessible curb ramps and replaced many sections of the sidewalk
Built new curb bulbs on Spring St at the intersections of 7th Ave and 8th Ave, and at Madison St and Minor Ave
Complete remaining curb ramps and replacing sections of the sidewalk
Demolished existing sidewalks and relocated and installed underground utilities
Built accessible curb ramps, rebuilt many sections of the sidewalk
Built new curb bulbs at the intersections of Madison St and 10th Ave, Union St and Denny Way
Complete remaining curb ramps and replacing sections of the sidewalk
Build remaining new curb bulbs at the intersections of Madison St , Pike St, 12th Ave, 15th Ave, 18th Ave, and 19th Ave
Install public art where Madison St, 14th Ave, and Pike St converge
Demolished existing sidewalks and relocated and installed underground utilities
Built accessible curb ramps and replaced many sections of the sidewalk
Built new raised crosswalk at 24th Ave E and new curb bulb at Madison St and John St
Complete remaining curb ramps and replacing sections of the sidewalk
Build remaining new curb bulb at Madison St and 27th Ave
Install new and upgraded traffic signals
Removed existing signals and installed temporary signals
Installed and relocated conduit for new streetlights and signals
Installed new signal poles other elements for upgraded signals, including cabinets, lights, pedestrian push buttons, transit priority lights, improved communication systems and vehicle detection
Turned on upgraded signals at 7th Ave and Madison St and 7th Ave and Spring St
Finish installing remaining signal poles other remaining other elements for upgraded signals, and turn on remaining upgraded signals
Remove remaining temporary signals
Removed existing signals and installed temporary signals
Installed and relocated conduit for new streetlights and signals
Installed new signal poles other elements for upgraded signals, including cabinets, lights, pedestrian push buttons, transit priority lights, improved communication systems and vehicle detection
Turned on upgraded signals at 8th Ave and Madison St
Turned on new pedestrian signal at Terry Ave and Madison St.
Finish installing remaining signal poles other remaining other elements for upgraded signals, and turn on remaining upgraded signals
Turn on new signal at 9th Ave and Spring St.
Remove remaining temporary signals
Removed existing signals and installed temporary signals
Installed and relocated conduit for new streetlights and signals
Installed new signal poles other elements for upgraded signals, including cabinets, lights, pedestrian push buttons, transit priority lights, improved communication systems and vehicle detection
Turned on upgraded signals at E Denny Way/22nd Ave and E Madison
Finish installing remaining signal poles, streetlights, other remaining other elements for upgraded signals, and turn on remaining upgraded signals
Turn on new traffic signals at: 10th Ave and Madison St; 18th Ave and Madison St; 19th Ave and Union St
Remove remaining temporary signals
Remove existing signals and installed temporary signals and streetlights
Installed and relocated conduit for new streetlights and signals
Installed new signal poles other elements for upgraded signals, including cabinets, lights, pedestrian push buttons, transit priority lights, improved communication systems and vehicle detection
Finish installing remaining signal poles, streetlights, other remaining other elements for upgraded signals, and turn on upgraded signals
Turn on new traffic signal at Martin Luther King Jr Way and Harrison St
Remove remaining temporary signals
Build new bus stations and improved bus stops
Removed existing bus shelters, installed foundations for new bus stops, installed electrical conduit and relocated utilities at bus stops
Removed old trolley wires on Madison St between 5th Ave and 6th Ave and installed new trolley wire poles
Build new bus platforms, install new bus shelters and other bus stop amenities
Removed existing bus shelters, installed foundations for new bus stops, installed electrical conduit and relocated utilities at bus stops
Removed old trolley wire poles and installed new poles
Continue installing electrical conduit and relocating utilities
Build new bus platforms, install new bus shelters and other bus stop amenities
Install remaining new trolley wire poles
Complete new center-running bus stations on Madison St at 8th Ave, Terry Ave, and Boylston Ave
Removed existing bus shelters, installed foundations for new bus stops, installed electrical conduit and relocated utilities at bus stops
Removed old trolley wire poles and installed new poles
Continue installing electrical conduit and relocating utilities
Build new bus platforms, install new bus shelters and other bus stop amenities
Install remaining new trolley wire poles
Complete new center-running bus station on Madison St and 12th Ave
Removed many existing bus shelters, installed foundations for new bus stops, installed electrical conduit and relocated utilities at bus stops
Continue installing foundations, electrical conduit, and relocating utilities
Finish removing existing shelters
Build new bus platforms, install new bus shelters and other bus stop amenities
Poured foundation for new driver comfort station
Build the new bus layover area including road paving and street markings
Build remaining elements of the new comfort station including the building framing, siding, roofing, electrical, HVAC, and plumbing systems
Plant new landscaping and street trees
Installed flexi-pave around tree pits and started planting new trees and landscaping
Continue installing remaining flexi-pave, new trees, and landscaping
Install new planters on Madison St over I-5
Installed flexi-pave around tree pits and started planting new trees and landscaping
Continue installing remaining flexi-pave, new trees, and landscaping
Installed flexi-pave around tree pits and started planting new trees and landscaping
Continue installing remaining flexi-pave, new trees, and landscaping
Installed flexi-pave around tree pits and started planting new trees and landscaping
Continue installing remaining flexi-pave, new trees, and landscaping
Replace and build new underground water and sewer utilities
Built 3 new underground stormwater storage tanks (10th Ave between Madison St and Union St, Madison St between 12th Ave and 13th Ave, and E Pine St between 15th Ave and 16th Ave)
Replaced a 120-year-old water and sewer line
Upgraded fire hydrants
Replaced a 120-year-old water and sewer line
Upgraded fire hydrants